home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V13_2 / V13_287.ZIP / V13_287
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from unix2.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/gbvFJ8y00WB3E57U4N>;
  5.           Sun, 24 Mar 91 16:08:26 -0500 (EST)
  6. Message-ID: <YbvFIuu00WB3055k5x@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sun, 24 Mar 91 16:08:11 -0500 (EST)
  12. Subject: SPACE Digest V13 #287
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 287
  15.  
  16. Today's Topics:
  17.        SOLAR TERRESTRIAL BULLETIN - WARNING UPDATES - 18 MARCH
  18.              space news from Jan 28 AW&ST
  19.        Re: Saturn V (was: space news from Jan 28 AW&ST)
  20.             Re: Magellan Update - 03/13/91
  21.             Re: Magellan Update - 03/11/91
  22. Re: German conference highlights doubts about ESA's manned space plans
  23.           Re: Government vs. Commercial R&D
  24.         Re: Value per pound vs. cost per pound
  25.  
  26. Administrivia:
  27.  
  28.     Submissions to the SPACE Digest/sci.space should be mailed to
  29.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  30.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  31.              tm2b+@andrew.cmu.edu
  32.  
  33. ----------------------------------------------------------------------
  34.  
  35. Date:    Mon, 18 Mar 91 01:06:13 MST
  36. From: oler%HG.ULeth.CA@vma.cc.cmu.edu (CARY OLER)
  37. Subject: SOLAR TERRESTRIAL BULLETIN - WARNING UPDATES - 18 MARCH
  38. X-St-Vmsmail-To: st%"space+@andrew.cmu.edu"
  39.  
  40.                 /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\
  41.  
  42.                         SOLAR TERRESTRIAL BULLETIN
  43.  
  44.                               18 March, 1991
  45.  
  46.                   Terrestrial Geophysical Warning Updates
  47.  
  48.                 /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\
  49.  
  50.  
  51. UPDATED WARNING INFORMATION
  52.  
  53.      A sudden magnetic impulse was observed at many middle latitude
  54. magnetic observatories on 17 March.  The SI was not observed locally,
  55. although Boulder and several other lower latitude stations reported a SI
  56. measuring 12 gammas at 20:36 UT.  The cause of this impulse is believed to
  57. be the major flare which occurred at 00:52 UT on 16 March.
  58.  
  59.      Geomagnetic activity has been generally quiet to unsettled since the
  60. impulse, although it has increased very slightly since about 02:30 UT on 18
  61. March.  Predictions call for possible minor storming over high latitudes,
  62. while middle latitudes should remain generally unsettled to active.  No
  63. storming is expected for the middle latitudes.
  64.  
  65.      The POTENTIAL GEOMAGNETIC STORM WARNING has been cancelled for the
  66. middle latitudes.  No magnetic storming is expected in conjunction with the
  67. major flare of 16 March.
  68.  
  69.      The warnings currently in progress follow:
  70.  
  71.   - POTENTIAL MAJOR SOLAR FLARE WARNING
  72.   - POTENTIAL SATELLITE PROTON EVENT WARNING
  73.   - POTENTIAL PCA ACTIVITY WARNING
  74.  
  75.      HF and VHF propagation should be normal to above normal over middle and
  76. low latitudes.  A slight degradation in middle and high latitude signal paths
  77. may be noticed on 18 March associated with the enhanced geomagnetic
  78. activity.  However, no significant degradation is expected.  HF MUF's
  79. should remain near 44 to 55 MHz (depending on location).  Openings on 6
  80. meters remain possible.  A potential also exists for SID (Sudden
  81. Ionospheric Disturbance) enhanced VHF communications.  The frequent number of
  82. M-class flares and the potential for a major flare may provide conditions
  83. favorable for SID-induced enhancements on VHF.  On the other hand, HF
  84. operators will notice potentially frequent minor SWF's (Short Wave Fades)
  85. during the daylight hours.
  86.  
  87.  
  88. **  End of Bulletin  **
  89.  
  90. ------------------------------
  91.  
  92. Date: 11 Mar 91 14:38:00 GMT
  93. From: agate!linus!philabs!ttidca!quad1!bohica!mcws!p0.f851.n102.z1.fidonet.org!Henry.Spencer@ucbvax.Berkeley.EDU  (Henry Spencer)
  94. Subject: space news from Jan 28 AW&ST
  95.  
  96. From: henry@zoo.toronto.edu (Henry Spencer)
  97. Path: wciu!elroy.jpl.nasa.gov!decwrl!sun-barr!rutgers!news-server.csri.toronto.edu!utzoo!henry
  98. Newsgroups: sci.space
  99. Subject: space news from Jan 28 AW&ST
  100. Message-ID: <1991Mar11.063845.8672@zoo.toronto.edu>
  101. Date: 11 Mar 91 06:38:45 GMT
  102. Amroc proposes Aquila, a four-stage hybrid launcher for Motorola's Iridium
  103. mini-comsat network, claiming 1500lbs to 300nmi at about half the cost of
  104. current alternatives.
  105.  
  106. ESA declares Ulysses fully operational.
  107.  
  108. Space insurance rates expected to rise after circa $200M losses on recent
  109. in-orbit satellite failures.
  110.  
  111. USAF Space Command has set up special data links to get data from missile-
  112. warning satellites directly to Patriot batteries nearly in real time.
  113. This plus other measures to improve communications have boosted warning
  114. time for Scud attacks to nearly 5min from 90-120s.  Warning-satellite
  115. officials say Iraq's Scud tests late last fall were serious blunders,
  116. because they gave the US a priceless opportunity to debug the warning
  117. setup before it was needed in combat.
  118.  
  119. Final design details have been settled for the field joint of the ASRM.
  120. The new joints are bolted together, the O-rings remain visible as the
  121. joint is mated, and the joint is designed to close up under pressure
  122. rather than opening.  Looking at the diagram, inboard of the bolts the
  123. joint is two flat flanges touching each other, and two O-rings are set
  124. into the surface of the lower flange near the inner edge.  The upper
  125. flange goes to the edge of the lower flange and then turns downward
  126. around it, with a third O-ring set into the outer surface of this lip,
  127. seating against the inner edge of the lower flange.
  128.  
  129. Another major ASRM design change is careful design of the internal shape
  130. of the fuel so that thrust drops off somewhat for a brief period early
  131. in the flight, eliminating the need for the SSMEs to throttle back during
  132. the period of maximum dynamic pressure.  This eliminates assorted possible
  133. failure modes related to throttle-back and the following throttle-up.
  134. Other changes include a revised casing design that has fewer assembled
  135. parts, one less field joint, welded factory joints, and better steel;
  136. a simpler nozzle design eliminating assorted joints and seals; and a
  137. redesigned igniter.  Finally, a lighter casing, a larger diameter holding
  138. more fuel, and a slightly more energetic fuel give higher thrust, longer
  139. burn, and about 18% more shuttle payload.  An important change unrelated
  140. to the booster design is the shift to highly automated manufacturing,
  141. since each handling step increases the odds of trouble.  [Another aspect
  142. of this, not mentioned, is that the ASRM plant at Yellow Creek will be
  143. NASA-owned, so NASA will be less tied to a single contractor and can
  144. exert more control.]
  145.  
  146. ASRM still has its critics, however.  Some say the $971M would be better
  147. spent elsewhere, especially on the SSMEs and on incremental improvements
  148. to the existing boosters (since ASRM is still five years away).  There
  149. is the possibility of political pressure to shift money to heavylift
  150. boosters, and concerns about the environmental effects of the rather
  151. "dirty" solid fuels.  Finally, there is still strong skepticism in some
  152. areas about the safety of manned flight on solid boosters, given the
  153. sensitivity to manufacturing flaws and the impossibility of test-firing.
  154. Cost considerations are likely to preclude abandoning SRBs, however.
  155.  
  156. [That's it for space news in this AW&ST.  They are rather preoccupied
  157. with other current events...  However, here's a *very* interesting bit
  158. from the 15 Feb issue of Science:]
  159.  
  160. Congress is very interested in the Augustine commission's recommendation
  161. for a heavylift launcher, and there is starting to be specific interest
  162. in one particularly heavylift launcher... the Saturn V!!  Truly, questioned
  163. about the matter, says the plans still exist.  It's pretty obvious, though,
  164. that NASA would really prefer a shuttle-derived launcher.  Congress may
  165. pursue the matter, although there is the obvious problem that tooling is
  166. gone and many subcontractors are gone, so resurrecting the Saturn V would
  167. be costly.
  168. -- 
  169. "But this *is* the simplified version   | Henry Spencer @ U of Toronto Zoology
  170. for the general public."     -S. Harris |  henry@zoo.toronto.edu  utzoo!henry
  171.  
  172.  
  173. --  
  174. : Henry Spencer - via FidoNet node 1:102/851 (818)352-2993
  175. : ARPA/INTERNET: Henry.Spencer@p0.f851.n102.z1.fidonet.org
  176. : UUCP: ...!{elroy!bohica,elroy!wciu,cit-vax!wciu}!mcws!851.0!Henry.Spencer
  177. : Compu$erve: >internet:Henry.Spencer@p0.f851.n102.z1.fidonet.org
  178.  
  179. ------------------------------
  180.  
  181. Date: 18 Mar 91 15:41:51 GMT
  182. From: pilchuck!seahcx!phred!petej@uunet.uu.net  (Peter Jarvis)
  183. Subject: Re: Saturn V (was: space news from Jan 28 AW&ST)
  184.  
  185. In article <695@newave.UUCP> john@newave.mn.org (John A. Weeks III) writes:
  186. >
  187. >I came to a personal conclusion that I could make or purchase any one of
  188. >the parts, therefore I could build an entire Saturn V if I wanted to.
  189. >.....the rest of the Saturn V is just a few large
  190. >aluminum tanks with a few other parts (like engines) added on.
  191. >Then it dawned on me that each of those parts were designed for a particular
  192. >weight, strength, functionality, temperature range, vibration response, etc.
  193. >
  194. Yes there were a few other parts. The "brains" of the Saturn V were in the
  195. guidance and control "ring" seated atop the 3rd stage. Around the inside of
  196. this ring was alot of equipment, (power supplies, controllers, etc.).
  197. You could duplicate the stuff, but it would be nice to have the schematics.
  198.  
  199. Peter Jarvis......
  200.  
  201. ------------------------------
  202.  
  203. Date: 18 Mar 91 17:13:10 GMT
  204. From: magnus.acs.ohio-state.edu!zaphod.mps.ohio-state.edu!sdd.hp.com!hp-pcd!hpcvca!rayd@tut.cis.ohio-state.edu  (Ray Davis)
  205. Subject: Re: Magellan Update - 03/13/91
  206.  
  207. >     The AACS (Attitude and Articulation Control Subsystem) Memory B readout
  208. >tests were successfully completed yesterday and spacecraft controllers are
  209. >continuing the process of loading Memory B today.  The upload of command
  210. >sequence M1072, with its associated radar control parameter and mapping
  211. >quaternion files was completed late yesterday and is executing properly.
  212.  
  213. . . . in other words JPL is getting their 'AACS' together ?
  214.  
  215.  
  216. Please, no flames. 
  217.  
  218. Ray Davis
  219. _________________________________________
  220. |  rayd@cv.hp.com             |
  221. |  rayd%hpcvca@hplabs.hp.com        |
  222. |  hplabs!hpcvca!rayd            |
  223. |_______________________________________|
  224.  
  225. ------------------------------
  226.  
  227. Date: 19 Mar 91 22:59:18 GMT
  228. From: pacific.mps.ohio-state.edu!zaphod.mps.ohio-state.edu!rpi!news-server.csri.toronto.edu!utzoo!henry@tut.cis.ohio-state.edu  (Henry Spencer)
  229. Subject: Re: Magellan Update - 03/11/91
  230.  
  231. In article <1991Mar16.012153.15047@jato.jpl.nasa.gov> baalke@mars.UUCP (Ron Baalke) writes:
  232. >>Well, be honest:  "as usual", not "as always".  JPL has had failures.
  233. >                                                 ^^^^^^^^^^^^^^^^^^^^^
  234. >This is true, but the last one was in 1964 with Ranger 6.
  235.  
  236. How quickly we forget Surveyors 2 and 4.  Or were those not "really" JPL
  237. failures because the birds were built by a contractor?
  238.  
  239. I was under the impression that Seasat was a JPL mission, although I can't
  240. immediately find confirmation of this.
  241.  
  242. I also wouldn't count what happened to the Viking 1 lander as exactly a
  243. shining example of JPL success.
  244. -- 
  245. "[Some people] positively *wish* to     | Henry Spencer @ U of Toronto Zoology
  246. believe ill of the modern world."-R.Peto|  henry@zoo.toronto.edu  utzoo!henry
  247.  
  248. ------------------------------
  249.  
  250. Date: 11 Mar 91 16:56:26 GMT
  251. From: news-server.csri.toronto.edu!utzoo!kcarroll@rutgers.edu  (Kieran A. Carroll)
  252. Subject: Re: German conference highlights doubts about ESA's manned space plans
  253.  
  254. Nick Szabo szabo@crg5.UUCP write:
  255. Subject: Re: German conference highlights doubts about ESA's manned space plans
  256. Date: 8 Mar 91 01:53:56 GMT
  257.  
  258. > In article <1991Mar7.172412.17631@zoo.toronto.edu> 
  259. > henry@zoo.toronto.edu (Henry Spencer) writes:
  260. > >Experience so far says very strongly that if you plan to do in-space repairs,
  261. > >you had better plan to have humans (or the imaginary just-as-flexible
  262. > >teleoperated robots which will be available almost right away now for sure,
  263. > >really, trust us) on hand.
  264. > Or, if you prefer not to pay the $1,000,000++/hour cost of an EVA, you 
  265. > could make sure it works before you launch it. 
  266.  
  267. Nick, to ``make sure'' that a satellite ``works'' before you launch it,
  268. you might have to spend anywhere from millions to tens of millions of
  269. dollars, depending on the complexity of the spacecraft. What level of
  270. reliability do you want to design into the satellite, and verify via
  271. ground testing? 99%? Or three nines? Or four? Do you want dual-string
  272. redundancy? Or are you going to make your designers hate you forever,
  273. and insist on triple-string?
  274.  
  275. All those satellites that we've seen fail on orbit, including the ones that
  276. the Shuttle was sent up to repair, were designed by people who tried
  277. to ``make sure that it works'' befoire launch. Many of the people involved 
  278. in design of these are very smart, and very conscientious, probably more so
  279. than you and I. Satellites don't typically fail because of sloppy design or 
  280. construction. They fail because >nobody< can imagine beforehand >all< the things 
  281. that might go wrong with a complicated, custom-built device.
  282.  
  283. My view is the cost of using spacecraft could be made cheaper if moderately-priced
  284. on-orbit check-out and servicing facilities were available to be rented out.
  285. That way, a great deal of the expense in designing spacecraft could be eliminated
  286. (``the NASA way'' of design wouldn't have toof the expenses of ground-testing the beasts. However, this assumes that
  287. you have >people< in orbit to do the testing and repair --- because the things that
  288. will go wrong with your satellite will be exactly those that you didn't anticipate,
  289. and so you won't have built your teleoperated robot to handle that
  290. unexpected contingency, and so the robot won't be able to effect the repair.
  291.  
  292.  
  293. -- 
  294.  
  295.      Kieran A. Carroll @ U of Toronto Aerospace Institute
  296.      uunet!attcan!utzoo!kcarroll kcarroll@zoo.toronto.edu
  297.  
  298. ------------------------------
  299.  
  300. Date: 11 Mar 91 09:54:00 GMT
  301. From: sdd.hp.com!zaphod.mps.ohio-state.edu!think.com!linus!philabs!ttidca!quad1!bohica!mcws!p0.f851.n102.z1.fidonet.org!Nick.Szabo@ucsd.edu  (Nick Szabo)
  302. Subject: Re: Government vs. Commercial R&D
  303.  
  304. From: szabo@crg5.UUCP (Nick Szabo)
  305. Path: wciu!elroy.jpl.nasa.gov!sdd.hp.com!spool.mu.edu!uunet!zephyr.ens.tek.com!tektronix!sequent!crg5!szabo
  306. Newsgroups: sci.space
  307. Subject: Re: Government vs. Commercial R&D
  308. Message-ID: <21316@crg5.UUCP>
  309. Date: 11 Mar 91 01:54:32 GMT
  310. In article <244.27D76BAC@nss.FIDONET.ORG> Paul.Blase@nss.FIDONET.ORG (Paul Blase) writes:
  311. >Maybe it is more
  312. >subtle than I thought.  I was saying that for the most part, it is only
  313. >the government that has the need and the money to fund the development
  314. >                            ----         -----
  315. >of the first useful product from advanced research, especially if that
  316. >product is the first of its kind.
  317.  
  318. If understand your point, it is that government money is needed, not
  319. necessarily government lab work.  The patent statistics and analysis 
  320. of major inventions show that industry does indeed develop first 
  321. products, sometimes with some government money, sometimes not, but nearly 
  322. always without government intervention in the design process.  More basic 
  323. scientific advances are usually the products of university and commercial 
  324. research labs, often with government funding but again with little 
  325. intervention in the technical specifications.  
  326.  
  327.  
  328. -- 
  329. Nick Szabo            szabo@sequent.com
  330. "What are the _facts_, and to how many decimal places?"  -- RAH
  331.  
  332.  
  333. --  
  334. : Nick Szabo - via FidoNet node 1:102/851 (818)352-2993
  335. : ARPA/INTERNET: Nick.Szabo@p0.f851.n102.z1.fidonet.org
  336. : UUCP: ...!{elroy!bohica,elroy!wciu,cit-vax!wciu}!mcws!851.0!Nick.Szabo
  337. : Compu$erve: >internet:Nick.Szabo@p0.f851.n102.z1.fidonet.org
  338.  
  339. ------------------------------
  340.  
  341. Date: 14 Mar 91 00:34:00 GMT
  342. From: agate!linus!philabs!ttidca!quad1!bohica!mcws!p0.f851.n102.z1.fidonet.org!Glenn.A..Serre@ucbvax.Berkeley.EDU  (Glenn A. Serre)
  343. Subject: Re: Value per pound vs. cost per pound
  344.  
  345. From: gaserre@isis.isis.cs.du.edu (Glenn A. Serre)
  346. Path: wciu!elroy.jpl.nasa.gov!sdd.hp.com!spool.mu.edu!uunet!isis!isis!gaserre
  347. Newsgroups: sci.space
  348. Subject: Re: Value per pound vs. cost per pound
  349. Message-ID: <GASERRE.91Mar13113447@isis.isis.cs.du.edu>
  350. Date: 13 Mar 91 16:34:47 GMT
  351. I'd like to respond to Nick's responses, but I'm pressed for time and I'm not
  352. absolutely sure I should be posting (rather tha emailing).   I'd appreciate 
  353. some feedback on this.  I might manage responses in a week or so.  
  354.  
  355. What I'd really like to see discussed is Nick's contention that launch costs
  356. for ELV's can't be reduced much below $5,000/lb because of limitations 
  357. intrinsinc (sp?) to Expendables (feel free to correct me if that's not what
  358. you're saying, Nick :-).  What do people out there think the cost limiters
  359. are?  It's certainly not fuel.  
  360. --
  361.  
  362. --Glenn Serre         
  363. gaserre@nyx.cs.du.edu 
  364. -- 
  365.  
  366. --Glenn Serre         
  367. gaserre@nyx.cs.du.edu 
  368.  
  369.  
  370. --  
  371. : Glenn A. Serre - via FidoNet node 1:102/851 (818)352-2993
  372. : ARPA/INTERNET: Glenn.A..Serre@p0.f851.n102.z1.fidonet.org
  373. : UUCP: ...!{elroy!bohica,elroy!wciu,cit-vax!wciu}!mcws!851.0!Glenn.A..Serre
  374. : Compu$erve: >internet:Glenn.A..Serre@p0.f851.n102.z1.fidonet.org
  375.  
  376. ------------------------------
  377.  
  378. End of SPACE Digest V13 #287
  379. *******************
  380.